The plant consists of two tunnels approx. 50 m from each other.


Each tunnel is approx. 100 m long and ends as a blind alley inside the hill.


At the inner end the tunnels are connected through a concrete "house". The house contains the electrical machinery and control room which is protected from dripping water by the concrete.


To the album introduction